翻訳と辞書
Words near each other
・ Line 1 (Saint Petersburg Metro)
・ Line 1 (São Paulo Metro)
・ Line 1 Yonge–University
・ Line 1, Beijing Subway
・ Line 1, Chengdu Metro
・ Line 1, Chongqing Rail Transit
・ Line 1, Dalian Metro
・ Line 1, Dongguan Rail Transit
・ Line 1, Guangzhou Metro
・ Line 1, Hangzhou Metro
・ Line 1, Harbin Metro
・ Line 1, Kolkata Metro
・ Line 1, Kunming Rail Transit
・ Line 1, Nanchang Metro
・ Line 1, Nanjing Metro
Line 1, Ningbo Rail Transit
・ Line 1, Shanghai Metro
・ Line 1, Shenyang Metro
・ Line 1, Shenzhen Metro
・ Line 1, Suzhou Rail Transit
・ Line 1, Tianjin Metro
・ Line 1, Wuhan Metro
・ Line 1, Wuxi Metro
・ Line 1, Xi'an Metro
・ Line 1, Zhengzhou Metro
・ Line 10
・ Line 10 (BLT)
・ Line 10 (CPTM)
・ Line 10 (Madrid Metro)
・ Line 10 (Naples Metro)


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Line 1, Ningbo Rail Transit : ウィキペディア英語版
Line 1, Ningbo Rail Transit

| image = 一号线江厦桥东站.JPG
| image_width = 286px
| image_alt =
| caption = A view of the Jiangxia Bridge East Station
| type = Rapid transit
| system = Ningbo Rail Transit
| status = Operational
| locale = Ningbo, Zhejiang, China
| start = Gapqiao West
| end = Donghuan South Road
Xiapu (2016)
| stations = 20 (operational)
29 (total)
| routes =
| ridership =
| open = May 30, 2014
| close =
| owner = Ningbo
| operator = Ningbo Rail Transit Co.,Ltd.
| character = Underground
Elevated
| depot =
| stock =
| linelength = (operational)
(total)
| tracklength =
| notrack = 2
| gauge =
| el =
| speed =
| elevation =
| website =
| map =
| map_state = collapsed
}}
Line 1 of Ningbo Rail Transit () is a rapid transit line in Ningbo. It stretches from Gaoqiao Town in the west towards Qiuga Town in the east of the city and will further run into Beilun. The line started service on May 30, 2014.〔(Chinese)(今日上午10时左右宁波轨道交通1号线一期试运营 )〕
==Route==
Line 1 is the first metro line serving Ningbo. It stretches in west-east direction, starting from Gaoqiao Town in the west as a viaduct and turns into underground tunnel when it approaches Haishu District. After that the tunnel stretches under Zhongshan Road, a main road in Ningbo, crossing Fenghua River and enters Jiangdong District. Then it passes Ningbo East New Town and then go overground. Finally the metro line extends into Beilun District and ends there. The section between Gaoqiao and Ningbo East New Town has been constructed as the first phase which started service in May 30, 2014. The rest section from Ningbo East New Town to Beilun District is expected to open in 2016. The line has 28 stations in total, of which 12 are elevated and the rest are underground. Till June 2014, 20 stations of Line 1 are operational.〔

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Line 1, Ningbo Rail Transit」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.